Hot Weather, Brace, Bedroom Wiring, Ron’s Hearing Aids

I’ve been having pain in my right hand so, unable to locate our supply of orthopedic equipment, bought a brace and wore it last night. It helped.

It’s been hot, with a cold front and possible t-storms expected later today.

The electrician wired the driveway side bedroom yesterday. Drywall to be installed next week along with remaining plumbing re-dos.

In spite of the heat, the first floor of the house has been surprisingly comfortable but upstairs has been hot. Ron and I hefted the portable air conditioner up the stairs a couple of days ago. To my relief, it works. Have been using it in our bedroom the last two nights and set it up for the electrician yesterday.

Bought two new hoses, 50 and 80 feet, and a cart.

So far, so good on the transplants. I repotted the rhubarb.

Paid the semi-annual water/sewer bill.

This past Tuesday, we passed through Stefanik country to Albany for Ron’s hearing aids. He seems happy with them.