$30,000 in labor costs for the second bedroom/hallway/stairway project.
$8,200 for the driveway.
Received and signed the Mass Save contract for insulation.
Vermiculite removal starts tomorrow.
$30,000 in labor costs for the second bedroom/hallway/stairway project.
$8,200 for the driveway.
Received and signed the Mass Save contract for insulation.
Vermiculite removal starts tomorrow.