Peter finished up the electric work in the garage; everything works: lights, doors, outlet.
Ryan and Erin finished the windows and installed a downspout on the new gutter.
I stupidly asked the garage door techs to install manual locks; they aren’t needed now that the electricity is hooked up. Oh, well, good if we lose power, I guess.
We attended a pretty tea at the Senior Center, a twice-a-year event put on by a local woman. She provided real linens, real tea cups, an assortment of teas and home-baked pastries, including scones.
Unfortunately, we were not able to sit with anyone else, the other tables were full, but we did chat a bit with the hostess and her “crew”. We were lucky to get in. Apparently I should have signed us up first, but evidently some people didn’t show who had made reservations.
The architect and our construction supervisor measured and consulted on the second story work.
The skin around my eyes is flaring up again. Got to take allergy meds more consistently, I guess, at least until my medical visit in early March.