The bathroom vanity is installed completely, went like clockwork, and I made progress coding-wise yesterday. Figured out how to consume the FRED web service and reformatted the preowned detail page to look pretty close to John’s design.
We haven’t heard from Pat the carpenter; hope he’s okay.
Truck is at the shop, possibly a fuel system problem. AAA tested the battery and ended up towing it to Midas. Ron and I got there just before closing, which was fortunate since I was able to talk with Jeff. Portside driver could not have been nicer or more careful with my pal. The dispatcher told us traffic was a mess over the Sagamore due to a lane closure.
Kevin the plumber cut out a section of drywall in the bathroom closet to give us access to the bathtub plumbing. Ron is going to make a panel to cover it, so we haven’t put the closet back together yet.
Ron got us set up for movie tix at the base yesterday.
Ron returned the chipper to Home Depot on Thursday and picked up a bunch of new tools at Harbor Freight. I was at the Commission for most of the morning working on FRED with Jay. Got all my eye meds from the pharmacy at Stop & Shop. Finances were complicated, but Arthur and Pat figured it out.