The carpenters had a banner day yesterday, installed 14 (over half) the LVLs. In lieu of scaffolding or tearing the ceiling apart, they hoisted them through a window. It was a good system, and it worked beautifully.
A handyman replaced the siding around the front door the other day. The entryway looks a lot better but the caulking is not so great.
We did two transfer station runs yesterday, including a couple of barrels of weeds. Disposed of trash, two non-working window fans, styrofoam packing materials from the air conditioners and recyclables.
I finally cleaned the deck with the shop vac. Just as well, it’s raining now and expected to continue all day.