Insulation; Oil Tank; More Plumbing

The new oil tank arrived this past Wednesday.

The crew from Potential Energy and an auditor from Clear Result worked here yesterday and today.

The auditor found a couple of small deposits of vermiculite which we took care of. That left only trace amounts, so he gave the okay to proceed.

James was also here and texted later that we got our permit!

I picked up paint at Aubuchon.

Ron’s prescription came through at Walmart!

Bill did more work in the driveway side bedroom.

While I was out fetching Ron’s meds, Norm figured out the vent business.

We enjoyed a terrific set by the Grace Jones Quartet at MCLA. Nice theater, easy parking; we’ll be back.

The Potential Energy crew finished work today. Their lead was great about answering my many questions and they worked diligently and well.

They were able to cover the two crawl spaces with moisture barriers. They replaced the aluminum siding perfectly and finished the blown-in insulation before it started to rain.

Norm came back to connect the vent to the pipe he’d installed in the attic. Rather than cut through the wall, he set the fitting by touch and sound.

Bill was back briefly this morning. It looks like that bedroom will be finished some time next week.