The windows arrived and more roofing got done but little else.
A structural engineer met with our construction supervisor. They came up with two possible scenarios: eliminating the guestroom or reinforce with a beam. Estimates to come.
I cooked a chickpea, rice and stir fry vegetable stew with components from a HelloFresh package, then homemade vanilla pudding. Both were good.
A driver from DelMolino took away the pile of boards and carpet from the attempted guest room renovation.